Built to suit
Built-to-suit is a property term that describes a scenario in which a developer (or building owner) provides a building that is built (or refurbished) to a tenant’s exact specification. The developer finances the project and is responsible for its design, construction and completion. The developer retains ownership once the land and the building(s) are leased to the tenant.
Built-to-suit properties can range from single units to multi-building facilities. Agreements are usually made between the developer and a single tenant, although more than one tenant may be involved.
According to Savvas Kotsopoulos of law firm Miller Thomson, the arrangement between developer and tenant essentially comprises two agreements:
- A development or construction agreement, the result of a request for proposal (RFP) process, which defines the relationship between the landlord and tenant from the design through construction of the building, and
- A lease agreement which stipulates the terms of the occupancy post-construction. In some cases, the provisions regarding the construction of the building are included in the lease itself or captured in an accompanying ‘work letter’.
The construction aspect of this arrangement is usually the key issue and the most complicated, warranting close attention to the landlord’s and the tenant’s responsibilities in this regard.
Build-to-suit agreements can be highly complex, as they must encompass issues of design, construction, timing and financing and so they must be drafted carefully.
[edit] Further information
For more detailed information, see ‘Laying the Foundation for a Build-to-Suit Lease’, by Savvas Kotsopoulos of Miller Thomson. https://www.millerthomson.com/en/publications/communiques-and-updates/leasing-times/december-3-2012/laying-the-foundation-for-a-build-to-suit/
[edit] Related articles on Designing Buildings Wiki
- Break clauses in leases.
- Build to rent.
- Development appraisal.
- Feasibility studies for construction projects.
- Funding options.
- Funding prospectus.
- Ground rent.
- Housebuilder.
- Landlord and Tenant Act.
- Lease Negotiations - Tenants Checklist.
- Leasehold.
- Overbuild.
- Property development finance.
- Rent to buy.
- Speculative construction.
- Statutory declaration excluding security of tenure.
- Types of development.
- Vacant possession.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.